Sub indices for building cost index from 1987

  • Dimensions

    • Category
      • 01 Carpentry and joinery
      • 02 Concreting and plastering
      • 03 Plumbing
      • 04 Electrical wiring
      • 05 Metalwork
      • 06 Painting
      • 07 Floor and wall coverings
      • 08 Machine work, transp.
      • 09 Supervision and sundry manual work
      • 10 Miscellaneous
      • Total
      • Thereof: Labour cost
      • Material cost
      • Other (nr. 01-3, 08 and 10)
      • 11 Design
      • 12 Site works
      • 13 Municipal land and service charges
      • Index total
    • Stage
      • Total
      • stage 1
      • stage 2
      • stage 3