Percentage of students enrolled in Engineering, Manufacturing and Construction programmes in tertiary education who are female (%)

  • Provider: World Bank
  • Source URL: http://data.worldbank.org/indicator/UIS.FEP.56.F500
  • Catalog: Yearly from 1998 to 2015
  • Localized to: English
  • Description:

    Total number of female students in a given tertiary education programme, expressed as a percentage of the total number of students enrolled in the given tertiary education programme.

  • Dimensions

    • Country
      • Afghanistan
      • Albania
      • Algeria
      • Andorra
      • Angola
      • Antigua and Barbuda
      • Argentina
      • Aruba
      • Australia
      • Austria
      • Azerbaijan
      • Bahrain
      • Bangladesh
      • Barbados
      • Belarus
      • Belgium
      • Benin
      • Bhutan
      • Bosnia and Herzegovina
      • Botswana
      • Brazil
      • Brunei Darussalam
      • Bulgaria
      • Burkina Faso
      • Burundi
      • Cabo Verde
      • Cambodia
      • Cameroon
      • Canada
      • Cayman Islands
      • Central African Republic
      • Chile
      • Colombia
      • Congo, Dem. Rep.
      • Congo, Rep.
      • Costa Rica
      • Cote d'Ivoire
      • Croatia
      • Cuba
      • Curacao
      • Cyprus
      • Czech Republic
      • Denmark
      • Djibouti
      • Dominican Republic
      • Ecuador
      • Egypt, Arab Rep.
      • El Salvador
      • Eritrea
      • Estonia
      • Ethiopia
      • Finland
      • France
      • Gambia, The
      • Georgia
      • ...